STUDY ON APPLICATION OF GENETIC ALGORITHM IN CONSTRUCTION RESOURCE LEVELLING

N.Satheesh Kumar,R.Raj Kumar

Resource management ensures that a project is to be completed on time, at cost, and its quality is as previously defined; nevertheless, the scarcity of resources is a usual reason for project delays. Traditional analytical and heuristic approaches are inefficient and inflexible when solving construction resource levelling problems. The proposed algorithm can effectively provide the optimal or near-optimal combination of construction resources by the starting and finishing dates of activities subjected to the objective of resource levelling. In the proposed method the activity to be selected first for shifting is based on the largest value of resource rate. The process is repeated for all the remaining activities for possible shifting of resources by searching the fittest solution by the Genetic Algorithm. The GA procedure searches for optimum results in set of tasks and priorities that produce shorter project duration and better using MS Excel Evolver software

மறுப்பு: இந்த சுருக்கமானது செயற்கை நுண்ணறிவு கருவிகளைப் பயன்படுத்தி மொழிபெயர்க்கப்பட்டது மற்றும் இன்னும் மதிப்பாய்வு செய்யப்படவில்லை அல்லது சரிபார்க்கப்படவில்லை

குறியிடப்பட்டது

கல்வி விசைகள்
ஆராய்ச்சி பைபிள்
CiteFactor
காஸ்மோஸ் IF
RefSeek
ஹம்டார்ட் பல்கலைக்கழகம்
அறிவியல் இதழ்களின் உலக பட்டியல்
அறிஞர்
சர்வதேச புதுமையான இதழ் தாக்க காரணி (IIJIF)
சர்வதேச அமைப்பு ஆராய்ச்சி நிறுவனம் (I2OR)
காஸ்மோஸ்

மேலும் பார்க்க