Priority Indexing of Factors Affecting Cost Overruns using AHP Technique

Hiral H. Patel, Chirag J. Shah, Rushabh A. Shah, Urvesh N. Barot

This research work has been aimed to find out the causes that are causing cost overruns in the construction projects. This research activity was entirely assessed through questionnaire survey. Various literatures have been reviewed for assessment and evaluation of factors that are causing cost overruns in construction projects. The respondents were selected from various construction occupancy mainly architects, builders, contractors, structural engineers and various consultancy firms. The results accomplished from survey revealed that the major causes of delays and cost overruns during construction projects are the escalation of the materials prices and discontinuity of funds. The overall ranking analysis are indicating that Technical Drawings, Government Policies, Increase in Expenses, Festivals, Investigation or Tests and Specifications are most critical factors, that are responsible for construction cost overruns in South Gujarat specially in Tapi and Surat District

குறியிடப்பட்டது

கல்வி விசைகள்
ஆராய்ச்சி பைபிள்
CiteFactor
காஸ்மோஸ் IF
RefSeek
ஹம்டார்ட் பல்கலைக்கழகம்
அறிவியல் இதழ்களின் உலக பட்டியல்
அறிஞர்
சர்வதேச புதுமையான இதழ் தாக்க காரணி (IIJIF)
சர்வதேச அமைப்பு ஆராய்ச்சி நிறுவனம் (I2OR)
காஸ்மோஸ்

மேலும் பார்க்க